摘要
概述了北京航天城污水处理厂工程概况和工艺概况,重点介绍了工程调试及试运行情况,最后结合实际对CASS工艺特点谈了自己的看法。
Abstract The engineering situation and technological process especially the set up and trial running of Beijing Space Flight Center WTP are presented. Finally some personal views on the special characters of cyclic activated sludge system (CASS) process are described practically.
出处
《给水排水》
CSCD
北大核心
1999年第8期10-12,共3页
Water & Wastewater Engineering