摘要
指出不良地质条件对山岭隧道施工的危害性极大,必须采取针对性较强的辅助措施,以中梁山隧道为例,介绍了施工中常见的不良地质条件,并给出了相应的处理措施,取得了很好的处理效果。
This paper pointed that mountain tunnel construction of adverse geological conditions at high risk,highly targeted support measuresmust be taken.Take the Zhongliangshan tunnels for example,described the common adverse geological conditions in construction,and the corresponding treatment measures was given,and achieved a good treatment effect.
出处
《山西建筑》
2011年第12期171-172,共2页
Shanxi Architecture
关键词
隧道
施工
地质
岩溶
tunnel
construction
geology
fulgurite