摘要
宁夏大坝发电厂二期工程采用的热工控制系统为美国贝利(BAILY)公司的INFI-90分散控制系统(DCS)。在此讨论了该DCS中全程给水调节系统的被控对象特性、控制系统配置和组态调试方法,
The heat engineering control system applied in second project of Ningxia Daba power plant was INFI 90 distributed control system(DCS) which offered by Baily company(USA) In this paper, the process characteristic of feedwater system、control system configuration and trial method are discussed, according to the control system structure, the technique analyses and system appraising are also be presented
出处
《现代电力》
1999年第4期53-59,共7页
Modern Electric Power
关键词
给水调节系统
锅炉
集散控制系统
热工控制
feedwater control system
system configuration and trial, technique analyses
system appraising