摘要
中电投新疆乌苏热电厂一期(2×300MW)机组工程#1空冷平台采用钢桁架结构。钢桁架具有跨度大、截面高度高、重量大等特点。针对工程施工难点,介绍大跨度钢桁架整片安装技术、施工工艺流程、吊装顺序、质量和安全控制措施。由于措施得当,组织合理,保证了工程进度、质量和安全。
China Power Investment Sinkiang Wusu Thermal Power Plant Stage I(2 × 300MW) Unit Project # 1 Air Cooling Platform adopts steel truss structure.Steel truss has the characteristics of great span,high section height,big weight and the like.Integral installation technique of long span steel truss,construction process,lifting order,quality and safety control measures are introduced aiming at difficulties for the project construction.The project schedule,quality and safety are ensured due to appropriate measures and reasonable organization.
出处
《价值工程》
2011年第16期96-97,共2页
Value Engineering
关键词
桁架
组合
安装
truss
combination
installation