期刊文献+

基于可靠性的连续生产在制品库存的建模分析 被引量:4

Modeling of In-process Inventory in Continuous Production Based on Reliability
下载PDF
导出
摘要 以可靠性理论中的可修复系统模型为基础,运用可靠性框图及马尔科夫状态转移过程、从可靠性角度分析为保证连续生产所需的在制品库存数量问题,并构建串行生产线缓冲量可靠性模型。利用可靠性模型推导出为保证连续生产、瓶颈工序前应持有的在制品库存数量的计算公式。并通过实例计算验证了该模型的有效性。 Based on the repairable system model in the theory of reliability,using reliability block diagram and Markov state transition process,the in-process inventory which should ensure continuous production was analyzed from the point of view of reliability,and a serial production line buffer capacity reliability model was established.The formula of the number of in-process inventory that was used to ensure continuous production was deduced with the help of the reliability model.It is concluded that the reliability model is valid through the calculation of an example.
出处 《机床与液压》 北大核心 2011年第9期111-113,共3页 Machine Tool & Hydraulics
基金 中央高等基本科研业务费专项资金资助项目(2010ZT03)
关键词 缓冲区库存 连续生产 可靠性 Buffer stock Continuous production Reliability
  • 相关文献

参考文献6

二级参考文献38

  • 1马祖军,代颖.产品回收逆向物流网络优化设计模型[J].管理工程学报,2005,19(4):114-117. 被引量:59
  • 2[1] Umble M M,Srikanth M L.Synchronous Manufacturing [M].Cincinnati: South-western Publishing,1990.
  • 3[2] Goldratt E M,Cox J.The Goal,Croton-on-Hudson[M].NY: North River Press Inc.,1984.
  • 4[3] Schragenheim E,Ronen B.Drum-buffer-rope shop floor control [J].Production and Inventory Management Journal,1990,31(3):18-23.
  • 5[1]John J McManus. Control in the OPT environment [ J ]. Production Engineer, 1987,7 - 8: 20 - 21.
  • 6[2]Pisal Yenradee. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory [J]. Computers Industrial Engineering, 1994,27 ( 1 - 4 ): 217 -220.
  • 7[3]Thomas Corbett, Joao Mario Csillag. Analysis of the effects of seven drum- buffer- rope implementations [ J]. Production and Inventory Management Journal ,2001,3/4: 17 - 23.
  • 8[4]Robert Lundrigan. What is this thing called OPT? [J]. Production and Inventory Management, 1986,2: 2 - 11.
  • 9[5]F. Robert Jacobs. OPT uncovered: many production planning and scheduling concepts can be applied with or without the software [ J ]. Industrial Engineering, 1984,10: 32 - 34,36,38,41 - 42.
  • 10[6]C - H CHU, JC Hayya. Buffering decisions under MRP environment:a review [ J ]. OMEGA, 1988,16 (4): 325 - 331.

共引文献51

同被引文献25

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部