在工程量清单招标控制价开始实施之际,关于招标控制价的设立标准还存在一些误区,将对实行工程量清单招标的建设项目产生重大的影响。在分析招标控制价产生背景的基础上,提出招标控制价设立的正确标准,并分析影响招标控制价设立标准的因素,提出完善对策和具体措施。
This paper briefly expounds when the control price of tender puts into practice,as to the setting-up of the standards of it,there are still some mistakes which will have a significant impact on engineering project which executes quantities tender.To solve the problem,it is necessary to put forward the correct standards of control price of tender that is based on analyzing the background of it.After expounding the factors that have a significant influence on setting-up of the standards of control price of tender,perfect strategy and specific measures will be found.
出处
《建筑技术》
北大核心
2011年第6期537-539,545,共4页
Architecture Technology
基金
河南省软科学研究计划项目(12400440039)
南阳市科技局项目(2007RK06)
河南省重点科技攻关项目(102102310279)
南阳师范学院教学研究项目(2009)
关键词
招标控制价
标准
影响因素
tender control price
standards
factors