期刊文献+

水平井井下分注工艺管柱的研制及应用 被引量:20

The development and application of the downhole separate injection string for horizontal wells
下载PDF
导出
摘要 针对国内外水平井注水技术还处于探索阶段,国内部分油田未能根据层段内非均质性来考虑进行分段注水的问题,展开了水平井分注工艺技术的研究工作。研发的水平井井下分注工艺管柱主要由套管保护封隔器、水平井扶正器、逐级解封洗井器、水平井注水封隔器、水平井井下分注器以及水平井底阀等组成。吉林油田现场应用表明,水平井井下分注工艺管柱能实现水平井井下有效分段注水,可应用于水平井、斜井、直井分注等工艺中。 Domestic and foreign research on horizontal well water injection technology is still at the stage of exploration. Some domestic oilfields have not considered the heterogeneity of intervals in water injection by intervals. The research of horizontal separate injection technology was launched. The horizontal downhole separate injection string developed is mainly comprised of the packer for casing protection, horizontal well centralizer, staged releasing well-flushing device, horizontal water injection packer, horizontal downhole separate injector and horizontal bottomhole valve. The field application in Jilin Oilfield showed that the string could achieve effective horizontal downhole water injection by intervals. It can be applied to the separate injection in horizontal wells, inclined wells and straight wells.
出处 《石油机械》 北大核心 2011年第8期53-56,7,共4页 China Petroleum Machinery
基金 中石油股份公司"水平井低渗透改造重大攻关项目"子课题"水平井修井注水工艺技术研究"(JY06A2-4-1-2)
关键词 水平井 井下分注 工艺管柱 注水封隔器 horizontal well, downhole separate injection, technological string, packer
  • 相关文献

参考文献3

二级参考文献31

  • 1刘新.水平井注水技术新发展[J].石油知识,2005(3):14-15. 被引量:4
  • 2凌宗发,胡永乐,李保柱,王丽娟.水平井注采井网优化[J].石油勘探与开发,2007,34(1):65-72. 被引量:59
  • 3谷新华,谷溢.钻多分支水平井的一种新方法[J].世界石油工业,1997,4(3):34-36. 被引量:2
  • 4许宁,郭秀文.得克萨斯州NHSU油田低渗砂岩油藏水平井注采[J].世界石油工业,1997,4(4):40-43. 被引量:4
  • 5Petroleum Engineer International Editorial Board. Horizontal wells inject new life into mature field [ J ]. Petroleum Engineer International, 1992,64 (4) :49 - 50.
  • 6Sait Kocberber. Horizontal waterfloods are successful [ J ]. The American Oil&Gas Reporter, 1992,35 (10) : 126 - 127.
  • 7Timothy C Doerksen,Richard A Nicoud, Kenneth H Lueers, et al. Horizontal injeetion well experienee in the valhalla boundary lake“M” Pool [ C ]- SPE 30747,1995:462-473.
  • 8Bodnar D A, Clifford P J, Istw J S, et al. First horizontal water injectors in Prudhoe Bay Field, Alaska [ C ]. SPE 35588,1996:57 - 70.
  • 9Wallace T F, Garrett K D, Guillot S N. A new method of obtaining injection profiles in short radius horizontal wells [ C ]. SPE 35175,1996:293 - 300.
  • 10Seeberger F C, Rothenhoefer H W, Akinmoladum O J. The ultimate line drive using multilateral wells: plans for 200 km of horizontal hole in the Saih Rawl Shuaiba Reservoir, PDO [ C ]. SPE 36223,1996:536 - 541.

共引文献27

同被引文献83

引证文献20

二级引证文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部