摘要
针对当前项目建设过程中临时工程超规模,超标准,超预算等情况,探讨了如何加强临时工程成本控制,从事前控制、工程标准、计价程序等方面入手,提出了具体的成本控制措施,以期实现有效控制临时工程成本。
In light of excessive scale, excessive standards, and excessive budget temporary project in current project construction process, it explores how to strengthen temporary engineering cost control. Starting from aspects of prior control, engineering criteria, and pricing procedure etc. , it proposes specific cost control measures, so as to effectively control temporary engineering cost.
出处
《山西建筑》
2011年第18期225-225,共1页
Shanxi Architecture
关键词
临时工程
成本控制
计价程序
temporary engineering, cost control, pricing procedure