期刊文献+

调整时间与顺序相关的等同并行机调度 被引量:10

Identical Parallel Machines Scheduling with Sequence-dependent Setup Times
下载PDF
导出
摘要 调整时间与顺序相关的等同并行机调度在生产服务业与制造业中有着十分广泛的应用背景,具有计算复杂性的主要特点。调整时间与顺序相关的等同并行机调度是将被加工工件集的各工件分配给等同并行机资源,并安排工件的加工次序。它是决策的一种形式,其目的是优化一个或多个目标。研究以最小化被加工工件最大完工时间为目标的调整时间与顺序相关的等同并行机调度,建立该问题的数学规划模型,根据问题的结构特点开发基于两段式染色体表达的遗传算法以获得该问题的近似最优解;在所建立数学规划模型的基础上,引入所求解问题的下界对近似最优解的质量进行评价。对具有不同规模的问题实例进行计算试验,计算结果表明所设计的遗传算法能够在可接受的计算时间内获得合理的解。 Identical parallel machines scheduling with sequence-dependent setup time is extensively applied in productive service and manufacturing industry and its main characteristic is computational complexity.Identical parallel machines scheduling with sequence-dependent setup time is to allot a set of jobs to be processed into identical parallel machines and sequence the jobs on each machine.It is a type of decision making with the purpose of optimizingsingle objective or multiple objectives.Identical parallel machines scheduling with sequence-dependent setup time to minimize the maximum job completion time is studied.The problem is formulated as a mathematical programming model.According to the structure characteristic of the problem,a genetic algorithm based on two-part chromosome representation is developed to obtain near optimal solutions.Based on the proposed mathematical programming model,a lower bound for the problem is introduced to evaluate the quality of near optimal solutions.Computational experiments are conducted on instances of different sizes,and the computational results show that the designed genetic algorithm can obtain reasonable solutions within an acceptable computational time.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2011年第16期160-165,共6页 Journal of Mechanical Engineering
基金 国家科技支撑计划资助项目(2006BAH02A17)
关键词 等同并行机调度 调整时间与顺序相关 数学规划模型 下界 遗传算法 Identical parallel machines scheduling Sequence-dependent setup time Mathematical programming model Lower bound Genetic algorithm
  • 相关文献

参考文献10

  • 1GRAHAM R L, LAWLER E L, LENSTRA J K, et al. Optimization and approximation in deterministic sequencing and scheduling: A survey[J]. Annals of Discrete Mathematics, 1979, 5: 287-326.
  • 2PINEDO M. Scheduling: Theory, algorithms, and systems[M]. New Jersey: Prentice-Hall, Englewood Cliffs, 1995.
  • 3MOKOTOFF E. Parallel machine scheduling problems: A survey[J]. Asia-Pacific Journal of Operational Research, 2001, 18(2): 193-242.
  • 4ALLAHVERDI A, GUPTA J N D, ALDOWAISAN T. A review of scheduling research involving setup considerations[J]. Omega, 1999, 27(2). 219-239.
  • 5ALLAHVERDI A, NG C T, CHENG T C E, et al. A survey of scheduling problems with setup times or costs[J]. European Journal of Operational Research, 2008, 187(3): 985-1032.
  • 6何霆,刘飞,马玉林,杨海.车间生产调度问题研究[J].机械工程学报,2000,36(5):97-102. 被引量:105
  • 7GOLDBERG D E. Genetic algorithms in search, optimization and machine learning[M]. New Jersey: Addison-Wesley, 1989.
  • 8LOPES M J P, CARVALHO J M V D. A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times[J]. European Journal of Operational Research, 2007, 176(3): 1508-1527.
  • 9YALAOUI F, CHU C. An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times[J]. IIE Transactions, 2003, 35(2): 183-190.
  • 10CARTER A E, RAGSDALE C T. A new approach to solving the multiple traveling salesperson problem using genetic algorithms[J]. European Journal of Operational Research, 2006, 175(1): 246-257.

二级参考文献9

共引文献104

同被引文献100

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部