期刊文献+

可修系统混合多任务成功概率评估模型 被引量:10

Evaluation model of mixed multi-mission success probability for repairable systems
下载PDF
导出
摘要 装备任务成功性是指装备在给定的维修保障方案下成功完成规定任务的能力,其概率度量为任务成功概率,是重要的装备保障性评估指标。可修系统是装备系统重要的组成部分,当系统执行多个子任务构成的复杂任务时,其任务成功概率不仅与系统自身的任务可靠度、固有能力有关,还与每个子任务的准备时间和执行时间、任务成功要求、维修保障能力和数量等因素有关。在充分分析多任务执行过程的特点与可修系统任务成功性影响因素的基础上,给出了一种给定维修保障方案情况下可修系统混合多任务成功概率评估模型。最后,通过一个算例来说明该模型的有效性与实用性。 Mission successfulness means the capacity for material systems fulfilling given missions provided by maintenance support schemes. Its measurement is the mission success probability which is the important index of supportability assessment. The multi-mission success probability of repairable systems is not only dependent on its operational reliability and inherent capacity, but also the span of every sub-mission cycle and intermission, success requirements, quantity and a capacity of maintenance support resources and so on. Based on analyzing the characteristics of the multi-mission process and all the above effect factors, a model is studied on how to evaluate the mixed multi-mission success probability of repairable systems under a given maintenance support scheme. Finally, an example is given to demonstrate the validity and application of this model.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2012年第2期328-332,共5页 Systems Engineering and Electronics
关键词 系统建模 任务成功概率 生灭过程 可修系统 维修保障 system modeling mission success probability birth-death process repairable system maintenance support
分类号 E917 [军事]
  • 相关文献

参考文献14

  • 1Esary J D, Ziehms H. Reliability analysis of phased missions[C]// Proc. of the Conference of Reliabitity and Fault Tree Analy- sis, 1975:213 - 236.
  • 2Zang X. A BDD-based algorithm for reliability analysis of phased- mission systems[J]. IEEE Trans. on Reliability, 1999,48 (1) : 50 - 60.
  • 3Dugan J B. Automated analysis of phased-mission reliability[J]. IEEE Trans. on Reliability, 1991,40 (1):45 - 52.
  • 4Kim K, Kyng S P. Phased-mission system reliability under Markov environment[J], IEEE Trans. on Reliability,1994,43(2) :301- 309.
  • 5Bondavalli A, Chiaradonna S. Dependability modeling and evalu- ation of multiple-phased systems using DEEM[J]. IEEE Trans. on Reliability ,2004,53(4) :509 - 521.
  • 6郭波,张涛,张泉,谭跃进.备件组合方案下的多阶段任务成功性评估模型[J].系统工程理论与实践,2005,25(2):94-100. 被引量:20
  • 7Wnifrid G S. Mission success with components not as good as new[J]. Reliability Engineering and System Safety, 1996,52 (1) : 45 - 53.
  • 8Kim C. Analysis for mission reliability of a combat tank[J]. IEEE Trans. on Reliability, 1989, 38(2) :242 - 245.
  • 9Craw L H. A method for achieving an enhanced mission capacity[C]// Proc. of the Annual Reliability and Maintainability Symposi- um, 2002.
  • 10甘茂治 康建设 高崎.军用装备维修工程学[M].北京:国防工业出版社,1999..

二级参考文献32

共引文献164

同被引文献77

引证文献10

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部