摘要
文章对八钢二期6m焦炉进行了简单介绍,并对二期6m焦炉集气系统在开工前的问题进行了梳理,提出了改造及优化措施。
The paper introduced 6m coke oven of the second stage in Bayj Steel,the program was been pectination of 6m coke.oven in gather cokeoven gas system before put into production; optimize measure and experience be put for-ward for production.
出处
《新疆钢铁》
2012年第1期44-46,共3页
Xinjiang Iron and Steel
关键词
6M焦炉
上升管
集气管
6m coke oven
pipelineriser system
gas collector