期刊文献+

江苏电网月度机组组合系统设计 被引量:9

Design of Monthly Unit Commitment for Jiangsu Power Grid
下载PDF
导出
摘要 为了提升系统运行经济性,有必要在月度时间跨度上优化机组组合方案,并与日前、日内调度计划方案配合,制定更优的调度计划。结合江苏电网月度机组组合系统的建设,阐述了月度机组组合与日前、日内调度计划之间的配合关系,设计了月度机组组合系统的框架结构和计算流程,探讨了江苏电网月度机组组合系统的优点。江苏电网应用结果表明,月度机组组合系统能够有效优化机组启停方案,提升调度计划的精细化水平。 For the purpose of economy, it is necessary to optimize generation scheduling schemes with longer time-scale by monthly unit commitment. Based on the development of Jiangsu power grid, a methodology for coordination of monthly, daily and real-time generation scheduling is presented. Then the framework and a detailed calculation procedure of monthly unit commitment are developed. Meanwhile, the merits of monthly unit commitment are described. The results in Jiangsu power grid show that the unit commitment schemes can be effectively improved.
出处 《电力系统自动化》 EI CSCD 北大核心 2012年第13期106-109,共4页 Automation of Electric Power Systems
关键词 月度机组组合 日前发电计划 日内发电计划 安全约束机组组合 monthly unit commitment day-ahead generation scheduling intraday generation scheduling security constraint unit commitment (SCUC)
  • 引文网络
  • 相关文献

参考文献10

二级参考文献92

共引文献131

同被引文献114

引证文献9

二级引证文献87

;
使用帮助 返回顶部