摘要
通过对湛江港410#泊位被撞区域各构件受损情况的检测分析,提出了在不破坏码头上部结构的情况下对破损的桩基础、桩帽、靠船构件等结构进行维修加固的处理新方法,为港区的生产经营节省了大量时间,取得了良好的经济效益和社会效益,为类似维修加固工程提供参考。
Based on the testing report of Zhanjiang harbor 410# berth collision area, we bring out the reinforcement method for the broken pile, pile cap, berthing member and other members in the prerequisite of not damaging the super-structure of the harbor. This reinforeement method has the advantages of time saving, low cost and great social benefit, and thus may serve as reference for relevant reinforcement projects.
出处
《水运工程》
北大核心
2013年第1期161-165,共5页
Port & Waterway Engineering
关键词
码头
基桩修复
受力体系转换
wharf
pile reinforcement
stress system transform