糯扎渡水电站坝料填筑施工工法及质量控制 被引量:7

Construction Methods and Quality Control of Dam Embankment Materials,Nuozhadu Hydropower Project
下载PDF
导出
摘要 糯扎渡水电站高心墙堆石坝采用掺砾土心墙,坝料分区、料源种类多、施工工艺复杂,多项施工参数超过现有土石坝施工规范。文章阐述了糯扎渡水电站大坝坝料填筑施工工法及质量控制,满足了施工进度和质量要求。 The rockfill dam with high cutoff wall of Nuozhadu Hydropower Project applied the cutoff wall of soils with gravel mixed. Zones for material embankment and material types are various. The construction technology is complicated. A couple of construction parameters are beyond the requirements stipulated in the construction specification for earth-roekfill dam. Construction methods and quality control of dam embankment materials, Nuozhadu Hydropower Project, are described in this paper, which satisfy requirements on construction schedule and quality.
出处 《西北水电》 2012年第A02期88-91,共4页 Northwest Hydropower
关键词 糯扎渡水电站 心墙堆石坝 坝料填筑工法 质量控制 Nuozhadu Hydropower Project rockfill dam with cutoff wall construction methods for embankment materials of dam qualitycontrol
  • 相关文献

参考文献3

二级参考文献3

  • 1李宜民.理论力学[M]徐州:中国矿业大学出版社,1996.
  • 2成大先.机械设计手册[M]北京:化学工业出版社,2008.
  • 3杨泗霖.焊接安全[M]北京:中国劳动社会保障出版社,2006.

共引文献2

同被引文献43

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部