期刊文献+

某深基坑降水方案数值分析

NUMERICAL SIMULATION PROGRAM OF THE FOUNDATION PIT
下载PDF
导出
摘要 本文通过对某地铁车站深基坑工程两种降水方案进行数值模拟,分析了一次性降水和分步降水条件下基坑的变形规律。通过数值分析得到,一次性降水引起的基坑变形明显大于分步降水引起的基坑变形,在施工工期许可的情况下,尽量采用分步降水的方案,以便减少基坑开挖引起的变形。 In this paper, a deep foundation pit of one subway station is analyzed under two different precipitation conditions, and the deformation laws of the pit under one - time precipitation and step - by - step precipitation conditions are investigated. The results indi- cate that the deformations caused by one - time precipitation are significantly larger than the deformations caused by step - by - step precipitation. Therefore, a step - by - step precipitation scheme is preferred in order to reduce the deformation cause by foundation ex- cavation, when construction period permits.
出处 《南阳理工学院学报》 2012年第4期77-79,107,共4页 Journal of Nanyang Institute of Technology
基金 河南省基础与前沿技术研究计划项目(102300410148)
关键词 降水 数值模拟 基坑变形 precipitation numerical simulation foundation pit deformation
  • 相关文献

参考文献9

二级参考文献43

共引文献274

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部