摘要
主要针对工程中剪力墙的质量问题,从钢筋检验和钢筋连接两个方面介绍了钢筋连接中的绑扎及直螺纹连接的方法,提出解决质量通病的措施,从而保证施工质量。
This article is aimed at solving the engineering quality problems in shear walls, it introduces the binding of steel bar connection and straight screw sleeve connection methods from two aspects of inspection and steel bar connection. Finally, it puts forward the ways to solve the quality common fault, so as to ensure construction quality.
出处
《山西建筑》
2013年第17期93-94,共2页
Shanxi Architecture
关键词
剪力墙
直螺纹套筒
质量通病
shear wall, straight thread sleeve, quality common fault