摘要
简要介绍了核电站烟囱流出物取样的两种取样方式,通过对两种取样方式的分析和比较,结合AP1000型核电站项目特点和三门核电站实际情况,对三门核电站烟囱流出物取样方式的选取进行分析探讨。
This paper introduces two sampling methods of plant stack effluent sampling system. A further discussion of the selection of Sanmen NPP stack effluent sampling method, through the comparison and analysis of both sampling methods, in combination with the characteristics of AP1000 project and the actual situation of Sanmen Nuclear Power.
出处
《辐射防护通讯》
2013年第1期24-27,30,共5页
Radiation Protection Bulletin