积石峡水电站施工导流设计概述 被引量:6

General Description of Design of Construction Diversion,Jishixia Hydropower Project
下载PDF
导出
摘要 积石峡水电站采用土石围堰一次拦断河床、大坝基坑全年施工、左岸隧洞过流的施工导流方式。主河床截流后枯水期导流洞单独泄流,汛期导流洞与泄洪排沙底孔联合泄流。该工程施工期的洪水流量选择充分利用了河段梯级上游龙头水库龙羊峡水电站的调洪控泄作用,导流洞下游段与中孔泄洪洞结合,且汛期利用泄洪排沙底孔参与导流,减小了导流建筑物规模,节约了工程投资,取得了较好的技术经济效益。 In construction of Jishixia Hydropower Project, the river is closed by the earthrock cofferdam once and the river flow is diver ted through the diversion tunnel on left bank so that the construction activities in the foundation pit could be executed the year round. At2 ter the main riverbed is closed, the river flow in the lowwater period is discharged by the diversion tunnel individually ; in the flood sea stm, by the diversion tunnel and the bottom outlet together. During the project construction, the function of the flood control by the up stream Ltmgyangxia Hydropower Station is fully utilized to control the incoming discharge, the downstream section of the diversion tunnel combines the middle flood discharge tunnel and the bottom outlet is applied for the flood diversion in the flood season so that the scale of the diversion structure is decreased, investment is reduced and a expected technical & economic benefits are gained.
出处 《西北水电》 2013年第4期50-52,共3页 Northwest Hydropower
关键词 积石峡水电站 施工导流 导流规划 导流隧洞 Jishixitl Hydropower Project construction diversion diversion planning diversion tunnel
  • 相关文献

参考文献4

二级参考文献5

  • 1中国水电顾问集团西北勘测设计研究院.黄河积石峡水电站工程项目申请报告[R].西安:中国水电顾问集团西北勘测设计研究院.2007.
  • 2中国水电顾问集团西北勘测设计研究院.黄河积石峡水电站工程可行性研究报告(审定本)[R].西安:中国水电顾问集团西北勘测设计研究院.2006.
  • 3DL/T 5087-1999.水电水利工程围堰设计导则[S],1999.
  • 4DL/T 5114-2000.水电水利工程施工导流设计导则[S],2000.
  • 5DL/T 5353-2006.水电水利工程边坡设计规范[S],2006.

共引文献8

同被引文献33

引证文献6

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部