摘要
针对洪屏电站地下厂房岩壁梁混凝土工程质量要求高、施工工期紧、施工条件复杂等实际情况,着重分析了其难点和重点,提出了相应的处理措施,并编制了具体的施工方案。
The concrete construction for the rock beam in underground powerhouse of Hongping Hydropower Plant is faced with high quality, tight schedule and complicated conditions. This paper analyzes the diffictdties and key points of concrete construction, proposes corresponding measures and puts forward a detailed implementation plan.
出处
《浙江水利科技》
2014年第1期42-44,共3页
Zhejiang Hydrotechnics
关键词
地下厂房岩壁梁
混凝土浇筑
洪屏水电站
rock
in underground powerhouse
concrete placement
Hongping Hydropower Plant