3CHANG Tand-hsien, LIN Jen-ting. Optimal signal timing for an oversaturated intersection[J]. Transportation Research,Part B,2000,34(6):471-491.
4郭耀煌 李军.车辆优化调度[M].成都:成都科技大学出版社,1994.22-48.
5Canen A G,Scott L G.Bridging theory and practice in VRP[J].Journal of the Operational Society,1995,46(1):1-8.
6Psaraftis H.Dynamic vehicle routing:Status and prospects[J].Annals.of Operations Research,1995,61:143-164.
7Bertsimas D J.Ryzin G V.A stochastic and dynamic vehicle routing problem in the euclidean plane[J].Operations Research,1991,39(4):601-615.
8Bertsimas D J,Ryzin G V.Stochastic and dynamic vehicle routing in the euclidean plane with multiple capacitated vehicle[J].Operations Research,1993,41(1):60-76.
9Bertsimas D J,Simchi-Levi D.A new generation of vehicle routing research:Robust algorithms,addressing uncertainty[J].Operations Research,1996,44(2):286-304.
10Dejun H.Dynamic Routing Problem with Service Time Windows.Doctor Dissertation[D].The Hong Kong University of Science and Technology,2000.