摘要
通过分析HRB500高强度钢筋的传统的两个生产工艺方案,结合HKB400的实际生产经验,在国家标准和内控标准的指导下,制定出了HRB500高强度钢筋的最佳试验方案。通过试验和对试验结果的分析,在成分调整和工艺优化后扩大了试制规模,最终实现批量生产。
The article analyzed two traditional production processes of HRB500 high strength steel bar. Under the guidance of national standard and internal control standard, the best trial production scheme of HRB500 high strength steel bar was made in combination with the practical production experience of HRB400. By experiment and the analysis of experimental results, the trial production scale was expanded after the composition adjustment and process optimization. Finally, the batch production of the steel bar was realized.
出处
《冶金信息导刊》
2014年第1期45-47,共3页
Metallurgical Information Review