摘要
装机容量为 2 4 0× 1 0 4 kW的广州抽水蓄能电站 (简称广蓄电站 )已于今年 3月全部建成投产 ,它是当今世界上装机规模最大的抽水蓄能电站。文章结合广蓄电站建设管理改革的成功实践 ,从管理体制、建设管理 ,运行管理和经营管理四个方面对管理改革进行了论述。由于管理改革的成功实践 ,使得电站建设取得了投资省、速度快、质量好、效益高。
The 2 400 MW Guangzhou pumped storage project became fully operational in March 2000,thus establishing itself as the biggest of its kind in the world. Based upon successful experiences with the project,the author spotlights the management practices in the four parts:that is project management improvements,reforms on construction management,reforms on plant operation management and reforms on business strategy.Thanks to the above said reform efforts,the project turns out to be quite a success in terms of cost saving,fast progress,good engineering quality,rich returns plus a friendly environment. [
出处
《中国工程科学》
2000年第11期52-59,共8页
Strategic Study of CAE