摘要
对宝钢炼钢厂 300 t整体钢包的整个周转过程热状态进行了跟踪测试,对各阶段的测 试结果进行了分析,并得出了周转过程各阶段钢包包衬温度变化规律.在此基础上提出缩短烘 烤时间,加盖保温等提高热循环效率的措施.
The test experiment on hot cycling of the 300 t ladle has been done in steel making plant of Bao Steel Corporation. The result of different segment has been worked out. The measures of improving effi-ciency of ladle hot cycling, such as shortening tiring period, keeping temperature by a cover have been pro-posed.
出处
《北京科技大学学报》
EI
CAS
CSCD
北大核心
2001年第5期418-420,459,共4页
Journal of University of Science and Technology Beijing