摘要
大坳混凝土面板堆石坝最大坝高 90 2m ,利用软岩料填筑大坝主体 ,现成功运行 全面介绍了大坝体形、面板、趾板、分缝止水、基础处理。
The most height of Daao concrete face rockfill dam is 90.2 m.The material of filling the dam is the soft rock.Now it run successfully.This paper introduced the design characteristics on dam shape,face-plate,toe-plate,water stop,foundation treatment and prototype observation.
出处
《江西水利科技》
2001年第2期94-98,104,共6页
Jiangxi Hydraulic Science & Technology