摘要
针对简单直线和U型装配线平衡问题,提出了改进阶位法.依据产品加工的作业元素时间和优先关系,综合考虑作业元素的时间阶位值和位置阶位值,求得综合阶位值.运用改进阶位法对装配线平衡问题求解,得到简单直线、单U型和双U型装配线的生产线平衡结果.结合算例1,对简单直线和U型装配线平衡效果与分枝定界法的结果进行了比较,改进阶位法的结果优于分枝定界法;结合实验算例2,验证了改进阶位法平衡效果好于时间阶位法,因此,改进阶位法是求解装配线平衡问题的有效方法.
This paper presents a simple and U-shaped assembly line balance problem with the modified ranked positional weight technique.First,according to the processing time and priority relationship of each task,the synthetical ranked positional weight is obtained by taking the time-ranked weight and position-ranked weight into comprehensive consideration.Then the modified ranked positional weight technique is applied to the assembly line balance problem to obtain the balancing results of simple,single U-shaped and double U-shaped assembly lines.With the simple example 1,the comparison of the balance effects is performed in modified ranked positional weight technique and branch-and-bound method.With the experimental example 2,it is proved that the balance effect of modified ranked positional weight technique is better than that of the time-ranked weight technique.Therefore,the modified ranked positional weight technique is an effective method to solve assembly line balance problem.
作者
焦玉玲
邢小翠
朱春凤
徐良成
邹连慧
JIAO Yuling;XING Xiaocui;ZHU Chunfeng;XU Liangcheng;ZOU Lianhui(College of Transportation,Jilin University,Changchun 130021, China;College of Civil Engineering,Jilin Jianzhu University, Changchun 130021,China)
出处
《同济大学学报(自然科学版)》
EI
CAS
CSCD
北大核心
2019年第1期143-148,共6页
Journal of Tongji University:Natural Science
基金
国家自然科学基金(51775238)
关键词
工业工程
双U型装配线
改进阶位法
industrial engineering
double U-shaped assembly line
modified ranked positional weight technique