摘要
构造了以工程投资、工期和工程质量为多属性变量的甲乙双方的多属性效用函数。以积式函数为目标函数 ,通过对双方博弈Nash解的数学分析得出了达成协议的合同平衡点处双方效用值的关系及其影响因素。根据效用平衡点的变化分析了索赔产生的机理 ,并从理论上解释了现实中工程界存在的“中标靠低价 ,盈利靠索赔”
The investment, schedule and quality of a project are taken as variables to construct the multiattribute utility functions of the two sides of a contract. The relationship between the utility values of the two sides and at the counterpoise point and the factors affecting the relationship are studied through the analysis of the Nash solution to their game playing. The causes of claims are analyzed according to the changes of the utility counterpoise points. The study is helpful to explain the phenomenon 'bidding with low price, profiting by claim'.
出处
《西南交通大学学报》
EI
CSCD
北大核心
2002年第3期323-327,共5页
Journal of Southwest Jiaotong University