2WANG Q, STOCKTON D J, BAGULEY P. Using neural networks in cost model development process [C].Proc of the 16th National Conf on Manufacturing Research, UK : Professional Engineering, 2000: 59-63.
3SMITH A E, MASON A K. Cost estimation predictive modeling:regression versus neural [J]. Engineering Economist, 1997, 42(2):137-161.