Monitoring the Technical Condition of Dams of Hydroelectric Power Plants with an Automated Monitoring and Earthquake Registration System
Monitoring the Technical Condition of Dams of Hydroelectric Power Plants with an Automated Monitoring and Earthquake Registration System
摘要
An approach is described that has been developed for auxiliary monitoring of technical condition of hydropower plant dams. It is based on analysis of changes in dynamic characteristics of dams obtained by an automated monitoring and earthquake registration system that records microseismic vibrations of structures. The configuration of the system as well as the results of seismometric monitoring of the dam of Krasnoyarsk hydroelectric power plant are described. To study behavior of the dam under normal and extreme loads it was proposed to develop a model of the dam with the use of the finite element method.
参考文献7
-
1Baryshev, V. G., Kuzmenko, A. P., Saburov, V. S., Bryzgalov, V. I., Epifanov, A. P., Khamchuk, A. G., and Chupin, G. A. 2002. "Dynamic Test Survey of Dams under Impact of Operational Dynamic Loads." Hydrotechnical Engineering 10: 26-36.
-
2Saburov, V. S., and Kuzmenko, A. P. 2013. Survey of High-Rise Buildings. Saarbriicken: LAMBERT Academic Publishing.
-
3Zolotukhin, E. P., and Kuzmenko, A. P. 2009. "A System for Monitoring of Dynamic Characteristics of Hydropower Plant Dams by Their Microseismic Vibrations." Problems oflnformatics 4: 1-8.
-
4Kuzmenko, A. P., Vorobyeva, D. B., and Kuzmin, N. G. 2012. "Control for Dynamic Characteristics with System of Earthquake Record and Monitoring of Technical State of Krasnoyarskaya HPP Dam." Restiya B.E. Vedeneev VNIlG 266:12-2 I.
-
5Kuzmenko, A. P., Saburov, V. S., Kuzmin, N. G., and Oseev, V. G. 2012. "Determination of Dynamic Characteristics of Dams under Earthquake Impact." Izvestiya B. E. Vedeneev VNIIG 265:15-25.
-
6Shulman, S. V. 1996. "Impact of Water on Frequences of Natural Vibrations of Massive Dams." In Proceedings of Russian R & D Institute of Hydrotechnics after B. E. Vedeneev, 209-22.
-
7Sokolovski, I. K. 2000. "Determining lrreverible Displaeement of Dams with the Use of Non-regression Method." In Proceedings of Russian R & D Institute of Hydrotechnics after B. E. Vedeneev, 62-9.
-
1席玉英,李洪建,范文标.城市生活垃圾理化性质的动态特性分析[J].上海环境科学,2002,21(12):721-724. 被引量:7
-
2王晋.坚持法制化 强化流域水资源统一管理[J].人民珠江,1999,20(5):22-23.
-
3斋滕谦一,王钟雄.水力发电厂的环境保护措施[J].福建电力科技,1992(1):18-20.
-
4许维光.气溶胶组成的全化学分析方法的研究[J].环境保护,1980,8(6):37-38.
-
5李春花.教育和管理是确保安全的永恒主题[J].水利天地,2012,27(3):39-41.
-
6贵阳关闭红枫水电厂[J].环保科技,2007,13(1):34-34.
-
7庞一敏,王文泰,康磊.上海天山污水处理厂进水水质动态特性分析[J].黑龙江环境通报,2012,36(2):62-64. 被引量:1
-
8王鹏.水力发电厂安全运行的大系统分析与控制研究[J].科学与财富,2015,7(16):218-218.
-
9周源,艾光华.某选矿厂内气溶胶污染水平调查及其多环芳烃的分析研究[J].江西理工大学学报,2011,32(1):17-21.
-
10郭平.建立水权市场的三项制度性准备[J].水利科技与经济,2005,11(2):65-68. 被引量:1