矿区总体规划编制探讨 被引量:4

Discussion on General Planning Compile of Mining Area
下载PDF
导出
摘要 文章总结了矿区总体规划编制中直接参与编制工作的单位关系图,对于从宏观上把握编制过程中各个单位的关系有较强指导作用,同时从前期资料收集与沟通、矿区范围确定、井(矿)田划分和生产能力确定、矿区范围内划分等方面对矿区总体规划编制过程中的几个重要问题进行了梳理,对总体规划的顺利编制有一定指导意义。 The paper summarized a relation diagram of direct involved compile work units in the general planning compile of the mining area. From a macro view, the diagram would have a strong guide role to understand the relation of each unit during the compile process. Meanwhile from the aspects of the previous information collection and linking, the mining area scope determined, the minefield divided and production capacity determined, the division within the mining area scope and others, treatments were conducted on several important problems occurred in the general planning compile process of the mining area and could have certain guide significances to the successful compile of the general planning.
作者 李志刚
出处 《煤炭工程》 北大核心 2014年第10期72-73,77,共3页 Coal Engineering
关键词 总体规划 编制关系图 资料收集 矿区范围 general planning relation diagram information collection mining area scope
  • 引文网络
  • 相关文献

参考文献4

  • 1国家发改委2012年第14号令,煤炭工业矿区总体规划管理规定[Z].
  • 2发改运行[2014]893号,关于加强煤矿井下生产布局管理控制超强度生产的意见[Z].
  • 3丁易,张豫生.编制矿区总体规划应注意的几个问题[J].煤炭工程,2002,34(9):27-28. 被引量:15
  • 4GB 50215-2005,煤炭工业矿井设计规范[S].