基于协商的虚拟企业完工风险管理

Negotiation Based Completion Risk Management for Virtual Enterprise
原文传递
导出
摘要 针对虚拟企业中盟主与盟员企业之间存在信息不对称的情况,研究了满足项目费用投资和子项目时序约束条件下的项目完工风险问题.考虑到各子项目的工期受盟主分配费用的影响,根据虚拟企业分布式决策的特点,提出了一种新的基于协商的费用—工期完工风险管理框架,并设计了三种让步策略,从而满足按期完工概率的要求,达到控制项目风险的目的.该协商框架分为2层,上层盟主和下层盟员企业.盟主首先给盟员分配资金,盟员根据所分配的资金确定子项目的三点完工时间,盟主收到盟员的响应后,基于计划评审法(program evaluation and review technique,PERT)对整个项目进行评价.最后通过算例分析了不同让步策略下的协商情况,结果表明该协商框架能有效管理完工风险. The completion risk problem for a project is studied under the constraints of project investment and precedence of subprojects in the case where the owner and partners in a virtual enterprise (VE) have asymetric information. In view of how each subproject's completion time is affected by allocated cost from the owner, and by the distribution feature of decisionmaking in VE, a novel costtime based completion risk management framework by negotiation is proposed to meet completion probability requirements and control project risk. At the same time, three concession tactics are designed. The framework has two levels: the toplevel owner, and the baselevel partners. The partners determine the three-estimate times based on allocated cost from the owner, and then feed them back to the owner. After receiving partners' responses, the owner evaluates them based on program evaluation and review technique (PERT). Finally, a numerical example is studied under these three tactics, and the results show that this framework can achieve effective completion risk management.
出处 《信息与控制》 CSCD 北大核心 2014年第5期619-623,共5页 Information and Control
基金 国家杰出青年科学基金资助项目(71325002,61225012) 国家自然科学基金资助项目(71071028,70931001,71021061) 高等学校博士学科点专项科研基金优先发展领域资助课题(20120042130003) 高等学校博士学科点专项科研基金资助课题(20110042110024) 中央高校基本科研业务费专项资金(N110204003,N120104001) 流程工业综合自动化国家重点实验室基础科研业务费资助(2013ZCX11)
关键词 虚拟企业 完工风险 协商 计划评审法 virtual enterprise completion risk negotiation program evaluation andreview (PERT)
  • 相关文献

参考文献19

  • 1Martinez M T, Fouletier P, Park K H, et al. Virtual enterprise-organization, evolution and control[ J]. International Journal of Production E- conomics, 2001,74 ( 1/2/3 ) : 225 - 238.
  • 2冯蔚东,陈剑,赵纯均.虚拟企业中的风险管理与控制研究[J].管理科学学报,2001,4(3):1-8. 被引量:98
  • 3卢福强,薛岩松.基于随机层次分析法的虚拟企业风险评价[J].信息与控制,2012,41(1):110-116. 被引量:8
  • 4Ip W H, Huang M, Yung K L, et al. Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise [ J ]. Comput- ers & Operations Research, 2003, 30(2) : 213 -231.
  • 5Huang M, Ip W H, Yang H M, et al. A fuzzy synthetic evaluation embedded tabu search for risk programming of virtual enterprises[ J]. Inter- national Journal of Production Economics, 2008, 116( 1 ) : 104 - 114.
  • 6Ye F, Li Y N. Group multi-attribute decision model to partner selection in the formation of virtual enterprise under incomplete information [ J ]. Expert Systems with Applications, 2009, 36 (5) : 9350 - 9357.
  • 7Madadi M, Iranmanesh H. A management oriented approach to reduce a project duration and its risk (variability) [ J]. European Journal of Operational Research, 2012, 219(3): 751 -761.
  • 8Raiffa H. The art and science of negotiation[ M]. Cambridge, MA, USA: Harvard University Press, 1982 : 35 - 40.
  • 9Lopes F, Wooldridge M, Novais A Q. Negotiation among autonomous computational agents, principles, analysis and challenges [ J ]. Artificial Intelligence Review, 2008, 29 (1) : 1 -44.
  • 10苏志龙,陈庆新,陈新,孙健.基于协商的模具虚拟企业生产项目规划[J].中国机械工程,2002,13(22):1931-1937. 被引量:11

二级参考文献57

  • 1李英杰,陈庆新,陈新度,陈新.多属性的虚拟企业并行协商项目规划算法[J].机械工程学报,2005,41(2):215-222. 被引量:17
  • 2刘晓君,孟凡文.模糊层次分析法在房地产投资风险评价中的应用[J].西安建筑科技大学学报(自然科学版),2005,37(1):135-137. 被引量:36
  • 3李英杰,陈庆新,陈新度,陈新.多属性的虚拟企业串行协商项目规划[J].中国机械工程,2005,16(7):598-603. 被引量:11
  • 4李英杰,陈庆新,陈新度,陈新.多属性虚拟企业部分并行协商项目规划[J].计算机集成制造系统,2005,11(6):810-817. 被引量:18
  • 5韩伯棠.管理运筹学[M].北京:高等教育出版社.2009.
  • 6Ip W H,Huang M,Yung K L,et al.Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise [J].Computers & Operations Research,2003,30(2):213- 231.
  • 7Huang M,Ip W H,Yang H M,et al.A fuzzy synthetic evaluation embedded tabu search for risk programming of virtual enterprises[J].International Journal of Production Economics, 2008,116(1):104-114.
  • 8Yang Z Q,Lin H.Assessment of knowledge shared risk in virtual enterprise based on modified analytic hierarchy process [C] //Proceedings of the 2008 IEEE International Conference on Information and Automation.Piscataway,NJ,USA: IEEE,2008:20-23.
  • 9Liu Y K,Liu B D.A class of fuzzy random optimization:Expected value models[J].Information Sciences,2003,155(1/2): 89-102.
  • 10WANG Dingwei, YUNG K L, IP W H.A Heuristic Genetic Algorithm for Subcontractor Selection in a Global Manufaturing Environment.IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews, 2001,31(2):189~198

共引文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部