摘要
抽水蓄能电站工程建设具有工期长、投资大的特点,这反映在工程造价管理上表现为阶段性、动态性、系统性等特征,使工程造价管理有相当的难度,影响着电站建设的健康发展。介绍了江西洪屏抽水蓄能电站项目管理中采用的代理型CM管理模式,研究了在代理型CM管理模式下建设管理项目部在项目实施阶段进行造价管理与避免失控的措施。结合组织、招标设计和施工图设计、招标采购、施工阶段以及信息化管理等方面提出了有效的工程造价管理方法,并采用主动控制、动态控制和技术与经济相结合的方法对工程造价进行全过程管理,以尽可能实现业主投资效益的最大化。
Pumped-storage power station project construction has the characteristics of long construction period and large investment, and it is reflected in the project cost management performance for periodic, dynamic and systemic characteristics, which making the pro- ject cost management considerablely difficult and effecting the healthy development of the power plant construction. This paper intro- duces that Hongping pumped-storage power station project management applies a new management mode which is similar to agent CM mode, then studies the measures of cost management for construction management department during the project implementation stage. Project cost management method is put forward from the organization, effective bidding design and construction drawing design, bid- ding, construction stage and information management, and the use of active control, dynamic control method and the combination of technology and economy of the whole process management of engineering cost are to maximize the owner of investment benefit.
出处
《南方能源建设》
2015年第1期104-109,共6页
Southern Energy Construction
关键词
抽水蓄能电站
CM模式
工程造价管理
pumped-storage power station
CM mode
engineering cost management