摘要
花园煤矿井下受到断层、冲刷带、岩浆岩侵蚀等多种地质构造的影响,地质条件十分复杂,为了能够有效躲开这些地质构造影响,也就出现了工作面在回采过程中跳面、搬面的情况,1310综采面就是在复杂条件下进行平行搬移的成功范例。
The influence of various geological structures such as fault, erosion belt, magrnatic rock erosion, causes that the geological conditions is very complicated, in order to avoid these, and the layout of the strip working face is random, working face 1310 fully mechanized face is the first time parallel examples of successful in the process of production for parallel removal.
出处
《山东煤炭科技》
2015年第9期15-16,18,共3页
Shandong Coal Science and Technology
关键词
安全
创条件
回撤
运输
安装
safety
creating conditions
removal
transportation
installation