摘要
介绍了一套输电线路带电补加销子工具,通过在绝缘操作杆一侧安装补加销子专用工具,来解决输电线路销子缺失故障。经过模拟实验和实际线路作业验证,该工具可以避免停电作业,同时大大缩短了作业时间,提高了工作效率,降低了安全风险,可以在带电补加销子作业中推广应用。
This paper developed special tool installed on one side a set of transmission line charged extra pin tool, through the insulation lever of the addition of peg, to solve the lack of transmission lines pin failure. Proven by simulation experiment and the actual line operation, the tool can avoid power operation, at the same time greatly shorten the operation time, improve work efficiency, reduce the safety risk, can be applied in the charged extra pin assignments.
出处
《云南电力技术》
2015年第4期62-63,共2页
Yunnan Electric Power
关键词
输电线路
带电作业
销子缺失
专用工具
transmission line
charged homework
missing pin
special tools