3Larsson M, Dahl J. Reduction of the specific energy use in an integrated steel plant--the effect of an optimization model [J]. ISIJ Int, 2003,43(10) :1664- 1673.
4Larsson M, Chuan W, Dahl J. Development of a method for analyzing energy, environmental and economic efficiency for an integrated steel plant[J]. Applied Thermal Engineering, 2006,26:1353 - 1361.
5Dutta G, Fourer R. A survey of mathematical programming applications in integrated steel plants[J]. Manufacturing & Service Operations Management, 2001,3 (4) : 387 - 400.
6Markland R E. Improving fuel utilization in steel mill operations using linear programming [J].Journal of Operations Management, 1980,1(2):95- 102.
7Kim J H, Yi H S, Han C. A novel MILP model for p/antwide multiperiod optimization of byproduct gas supply system in the iron and steel making process [J ]. Trans IChemE, 2003,81:1015- 1025.
8Yi H S, Han C H. Industrial application of MILP-based simultaneous compensation to a large scale byproduct gases network in an iron and steel making plant [ J ]. Ind Eng Chern Res, 2004,43:119- 126.
9Kim J H, Yi H S, Han C H. Plant-wide optimal byproduct gas distribution and holder level control in the iron and steel making process[J]. Korean J Chem Eng , 2003,20(3):429- 435.
10Bemporad A, Morari M. Control of systems integrating logic, dynamics, and constraints[J]. Automatica, 1999, 35:407 -427.