摘要
根据中国博览会会展综合体D1展厅的工程概况,确定了回填地基处理方案,探讨了大面积灰土和级配砂石回填地基的关键技术,通过堆载试验表明,回填地基的承载力和沉降量均满足规范要求。
According to Chinese Expo complex D1 exhibition hall engineering conditions,the paper determines backfilling foundation processing scheme,and explores critical large-area dust and grading dinas backfilling foundation technologies. Through loading test,it shows that:both the backfilling foundation bearing capacity and subsidence meet requirements.
出处
《山西建筑》
2016年第14期64-65,共2页
Shanxi Architecture
关键词
地基处理
灰土
砂石
堆载试验
foundation treatment
dust
dinas
loading test