摘要
超高层核心筒施工大多数采用液压爬模进行施工,核心筒墙体截面会随着核心筒高度升高而墙体厚度减小,有的墙体位置会发生较大变化,液压爬模要根据这些墙体变化采取相应的技术措施进行施工。本文根据广州市东风中路S8地块项目核心筒爬模实际施工经验,系统介绍液压爬模墙体变截面施工技术。
Hydraulic climbing formworks are widely used in the super high-rise construction, the core tube wall thickness will decrease along with the increase of the altitude, and some wall position will change greatly, so the hydraulic climbing formwork need to take appropriate technical measures for the construction of the wall in accordance with these changes. Based on summarizing the experience of the climbing formwork construction of Guangzhou Dongfeng Middle Road S8 block project, this paper will introduce the construction technology of hydraulic climbing formwork in wall variable cross section.
出处
《施工技术》
CAS
北大核心
2017年第2期113-116,128,共5页
Construction Technology
关键词
安装工程
模板
变截面
核心筒
施工技术
installation
formworks
variable seetion
core tube
construction