超小净距下穿高铁隧道减振爆破技术 被引量:12

Blasting vibration reduction technology for high-speed railway tunnel under ultra-small distance
下载PDF
导出
摘要 依托沪昆客专贵州段小高山隧道泄水洞下穿铁路隧道正洞工程,针对泄水洞0.5m超小净距爆破开挖下穿既有铁路隧道,对施工进度、爆破振动、爆破损伤等影响因素深入分析,提出采用预设减振保护结构结合数模,现场实时监测爆破振动响应,设置允许合成振速10cm/s作为预警振速界限,实时调整爆破方案的减振精细爆破设计思路,并结合后期监测等进行施工。结果表明,减振精细爆破设计在下穿钻爆施工中,能有效保证0.5m超小净距下穿既有隧道的安全运行,该工程的成功实践,可为类似下穿隧道工程的爆破开挖控制提供参考。 Based on the Guizhou section of Shanghai-Kunming passenger tunnel engineering of drainage tunnel under the railway tunnel, the excavation of the drainage tunnel with ultra-small distance of 0. 5 m is carried out. The construction progress, blas-ting vibration, blasting damage and other influencing factors were analyzed. The preset vibration protection structure combined with the numerical simulation was proposed. The vibration response of the blasting was measured timely. The allowable syn-thetic vibration velocity 10 cm/s was taken as the warning vibration threshold. Real-time adjustment of the fine blasting design was taken and the construction was combined with the latter part of the monitoring. The results showed that he fine blasting vi-bration reduction technology can ensure the safe operation of the existing tunnels when the drilling is carried out with 0. 5 m ul-tra-small clearance. It can provide a reference for similar blasting excavation control of tunneling projects.
作者 杜小刚 程玉泉 林从谋 DU Xiao-gang CHENG Yu-quan LIN Cong-mou(CCCC first Highway Xiamen Engineering Co. ,Ltd. , Xiamen 361021, Fujian, China Research Institute of Geotech-nical Engineering, Huaqiao University, Xiamen 361021, Fujian, China)
出处 《工程爆破》 2017年第2期44-48,共5页 Engineering Blasting
基金 中交第一公路工程局有限公司科技研发资助项目(KT2015-024)
关键词 减振爆破 下穿隧道 超小净距 数模研究 缓冲层 实时监测 blasting vibration reduction under tunnel ultra-small distance numerical simulation buffer layer real-time moni-toring
  • 相关文献

参考文献4

二级参考文献21

共引文献242

同被引文献79

引证文献12

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部