摘要 丹大高铁是规划建设的东北东部铁路通道的重要组成部分,共分3段:丹东至庄河段、金州登沙河至庄河段和大连至登沙河段,线路自大连北站接轨,抵达丹东。全线共设5座牵引站,均采用两相直供电方式,电能表接线可能存在误接线问题。在此,以明阳牵引站的实例分析两相供电系统电能表接线问题,确定正确接线,达到准确计量电量的目标。 Dandong-Dalian High Speed Rail is an important part of the eastern railway passage in the Northeast China, which consists of three sections, i. e. Dandong to Zhuanghe, Jinzhou Dengshahe to Zhuanghe and Dalian to Dengshahe. The lines are connected at Dalian North Station and extend to Dandong. A total of five traction stations are set up along the railway and all use two-phase direct power supply, and errors may occur in the wiring of watt-hour meters. For this purpose, this paper hereby analyzes the wring of twophase power supply system watt-hour metersby taking Mingyang Traction Station for example, so as to determine the correct wiring and achieve the goal of accurate electrical energy measuring.
作者 孙殿威 SUN Dianwei(State Grid Dalian Power Supply Company, Dalian, Liaoning 116001, China)
出处 《东北电力技术》 2017年第7期32-34,共3页 Northeast Electric Power Technology
关键词 高铁 牵引 两相 电能表 接线 high-speed rail traction two-phase watt-hour meter wiring
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部