3MIKKO KURTTILA,MAUNO PESONEN,JYRKI KAN-GAS, Miika Ka janus. Utilizing the analytic hierarchy process(AHP)in SWOT Analy sis-a hybrid method and its application to a forest-certification case [J]. Forest Policy and Economics, 2000( 1 )41-52.
4NERC. Transmission transfer capability, a reference document for calculating and reporting the electric power transmission capability of interconnected electric systems [R]. Princeton: New Jersey,1995.
5Docket No. RM 95-9-000. Open access same-time information system (formerly real-time information networks) and standards of conduct [S].
6Eiebe G C, Weight J G, Santos-Nieto M. Fast calculation of linear available transfer capability [J]. IEEE Trans on Power Systems,2000,15(3):1112-1116.
7Flueck J, Chiang H D, Shah K S. Investigating the installed real power transfer capability of a large scale power system under a proposed multiarea interchange schedule using CPFLOW [J].IEEE Trans on Power Systems,1996,11(2):883-889.
8Dai Y, McCalley J D, Vittal V. Simplification, expansion and enhancement of direct interior point algorithm for power system maximum loadability [J].IEEE Trans on Power Systems,2000,15(3):1014-1021.