期刊文献+

特高压直流换流站分压器预试方法研究 被引量:11

Preventive test method research of UHV DC converter station DC voltage divider
下载PDF
导出
摘要 为保持特高压直流分压器良好状态,以便发现问题及时处理,每年定期需要对其进行预防性试验。目前试验方法拆、接引线需要耗费大量人力、物力,既延长了停电时间,又因经常拆接引线可能造成设备及人员安全问题。结合特高压站安装在极线、中性线上的直流分压器自身结构特点,提出了不拆线测量高低压臂电容、分压比的试验方法,并在某变电站预防试验时运用该方法进行了实际测试。试验结果与历年试验数据对比表明,所提出的方法能在保证测试有效性的前提下,显著减少现场试验工作量。 In order to maintain a good state of the UHV DC voltage divider so as to find out the problem in time, it is necessary to carry out a preventive test on it every year. It not only prolongs the outage time and may cause equipment and personnel safety problems due to often disconnecting lead. Combined with the structure characteristics of DC voltage divider itself installed on polar line and neutral line, this paper presents a test method of measuring high-low voltage arm capacitance and partial pressure ratio without removing lead, and uses the method to the actual test of preventive test of substation. Test results are compared with the test data over the years, and the results show that the proposed method can guarantee the test validity and reduce the workload of field test.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2018年第3期152-157,共6页 Power System Protection and Control
基金 国家电网公司科技项目"直流工程用直流测量装置试验方法研究和装置研制"~~
关键词 特高压 直流换流站 直流分压器 预防性试验 UHV DC converter station DC voltage divider preventive test
  • 相关文献

参考文献12

二级参考文献159

共引文献424

同被引文献184

引证文献11

二级引证文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部