乌江大桥5#索塔下塔墩横梁采用支架法与墩身同步施工,支架形式采用牛腿三脚架和满堂支架结合形式。论文结合5#索塔下塔墩横梁施工对横梁支架的设计及施工进行总结。
The lower tower pier of No.5 cable bent tower of Wujiang River Bridge constrcts using bracket method and its construction is synchronized with the pier body. And the bracket using corbel bracket and full framing. This paper summarizes the design and construction of grider propping, through the construction of lower tower pier beam of No.5 cable bent tower.
出处
《工程建设与设计》
2018年第4期173-174,共2页
Construction & Design for Engineering
关键词
横梁
支架
总结
beam
bracket
summary