针对高桩承台基础结构中的底层混凝土施工,以钢套箱作为混凝土的施工模板,结合底板的承重特点,应用整体式承重系统工艺,形成模块化拼装、整体性安装。该工艺既能满足刚度要求,又方便安装和拆卸,缩短了施工时间。
For the bottom concrete construction of the foundation structure of elevated pile cap , we use thesteel sleeve box with the load-bearing characteristic as the concrete construction template , and adopt an integralload-bearing system process to realize the modular assembly and integral installation.The process can not only meetthe stiffness requirement , but also be easy to install and disassemble to shorten the construction time.