期刊文献+

新型材料快速构筑密闭在阳煤一矿的实践应用 被引量:4

The Practical Application of New Material in Rapid Construction of Closed Wall in Yangquan No.1 Coal Mine
下载PDF
导出
摘要 本文介绍了阳煤一矿针对传统密闭挡风墙中存在的问题,采用新型快速密闭来代替现有闭墙施工,不仅实现了工作面快速密闭的生产要求,而且降低了施工成本,减轻了工人劳动强度,提高了施工效率,增加了闭墙的可靠性和稳定性。 In this paper, the problems existing in the traditional closed wind wall of No1. Mine of Yangqaun Coal Mine, are introduced, and a new fast airtight is proposed to replace the existing closed wall construction, which not only realizes the quick closed face production requirement, but also reduces the construction cost, reduces the workers labor intensity, improves the construction effciency, and increases the reliability and stability of the closed wall.
作者 聂贵亮 Nie Gui-liang(No.1 Mine of Yangquan Coal Industry(Group)Co.,LTD.,Shanxi Yangquan 045008)
出处 《山东煤炭科技》 2018年第7期62-64,共3页 Shandong Coal Science and Technology
关键词 闭墙 快速充填 效率 closed wall fast flling effciency
  • 相关文献

参考文献2

二级参考文献6

共引文献30

同被引文献21

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部