摘要
针对老鹰山超长破碎带隧道施工,利用有限元软件Plaxis3D计算分析了开挖过程中隧道的变形情况,着重考虑了围岩等级、开挖方式、双线隧道等对隧道沉降和水平位移的影响。数值分析前,对各种材料的计算参数进行合理简化,其有效性也经过了其他有限元计算的验证。计算结果表明,CD法可以有效地减小开挖过程中破碎带围岩的变形,维持围岩的稳定性。实际施工过程中,刚进入破碎带时应采用CD法开挖,并实时监测隧道内变形情况,及时反馈监测结果以对比数值计算结果。
Based on the tunnel construction of super-long broken rock zone in Laoying mountain,we calculated and analyzedthe deformation of the tunnel during excavation process using the finite element software Plaxis3D,specially considered theinfluence of surrounding rock grade,excavation method and double-line tunnel on the tunnel settlement and horizontaldisplacement.Before numerical calculation,the calculation parameters of vatious materials were reasonably simplified,andtheir validity was also verified by other finite element calculations.The calculation results show that the CD method canefficiently reduce the deformation of rock in the broken zone to keep the stability.In the practical construction,the CD methodshould be used to excavation when entering the broken zone,the deformation in the tunnel should be monitored in time,andtimely feedback monitoring results to compare numerical results.
作者
徐宾宾
张羽
司维
XU Bin-bin;ZHANG Yu;SI Wei(CCCC Tianjin Port Engineering Institute Co., Ltd., Tianjin 300222, China;Key Laboratory of Port Geotechnical Engineering of Ministry of Communication, Key Laboratory of Port Geotechnical Engineering of Tianjin, Tianjin 300222, China;CCCC Investment 驭Engineering Co., Ltd., Beijing 100000, China)
出处
《中国港湾建设》
2017年第9期16-20,53,共6页
China Harbour Engineering
基金
天津市自然科学基金重点项目(16JCZDJC38800)
关键词
超长破碎带
仿真分析
围岩等级
CD法
三台阶法
super-long broken zone
numerical simulation
rock grade
CD method
three-step method