摘要 针对麻家梁矿综采工作面地质条件,对工作面顺槽破碎带提前进行注浆加固,采取了合理的注浆方案并对治理效果进行了监测分析,既减少了注浆量,解决了工作面随时出现的冒顶片帮问题,又避免了后期处理所带来的安全风险,为矿井安全生产提供可靠保障。 In view of the geological conditions of fully mechanized mining face in Majialiang Mine,grouting reinforcement is carried out in advance for the fracture zone along the working face along the channel,a reasonable grouting scheme is adopted and the effect of the grouting is monitored and analyzed,which not only reduces the quantity of grouting,but also reduces the amount of grouting.It solves the problem of roof fall in working face at any time,and avoids the safety risk brought by post-treatment,and provides reliable guarantee for mine safety production.
作者 王强 WANG Qiang(Ma Jialiang Mine Company Joint-stock by Datong Coal Industry and Zhejiang Provincial Energy Co.,LTD,Shanxi Shuozhou 036000)
出处 《煤矿现代化》 2019年第3期41-43,共3页 Coal Mine Modernization
关键词 破碎带 注浆加固 监测分析 安全生产 Fracture zone Grouting reinforcement Monitoring analysis Safety production
  • 相关文献

参考文献4

二级参考文献48

共引文献218

同被引文献53

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部