摘要
为解决水利水电工程施工阶段中场地布置不合理、工程量统计耗时多、技术交底不直观和质量管理信息传递不到位等问题,利用BIM技术,以输水箱涵为研究对象,分析BIM技术在解决以上问题时存在的优势。通过对Revit和Navisworks两款核心软件的运用,进而实现输水箱涵场地模型和3D施工结构模型的建立,以及模型的漫游、仿真模拟、信息的集成与共享。实例表明:BIM技术的应用可以避免场地布置的不合理、提高工程量统计的效率、进行可视化的技术交底和及时传递质量管理信息。
In order to solve the problems of unreasonable layout of the water conservancy and hydropower project during the construction phase, taking much time in project quantity statistics, the inconsistency of the technical delivery and the inability to transmit the quality management information, the BIM technology was used to study the water tank culvert and analyzed the advantages of BIM technology in solving the above problems. Through the application of two core softwares of Revit and Navisworks, it built the water tank culvert site model and the 3 D construction structure model and achieved the model roaming, simulation, information integration and sharing. The example shows that the application of BIM technology can avoid the irrational layout of the site, improve the efficiency of engineering statistics, visualize the technical disclosure and timely transmit quality management information.
作者
王欣
冯利军
WANG Xin;FENG Lijun(College of Urban and Rural Construction, Hebei Agricultural University, Baoding 071000, China;First Engineering Co., Ltd., 11 Bureau Group, China Railway, Xiangyang 441000, China)
出处
《人民黄河》
CAS
北大核心
2019年第4期135-138,158,共5页
Yellow River
关键词
BIM技术
输水箱涵
场地布置
工程量统计
技术交底
质量管理
BIM technology
water tank culverts
site layout
quantity statistics
technology exchange
quality control