摘要 针对沿空切顶卸压留巷巷道受断层影响大变形、无法进行常规支护等问题,对巷道表面位移、顶板离层进行监测,得到巷道围岩破碎后变形规律和围岩结构情况;并根据工程需求研发一种以新型无机注浆材料和注浆工艺为核心的层次注浆技术,对留巷巷道进行注浆加固治理。工程实践结果表明:经过层次注浆加固后,围岩变形得到快速控制,顶板下沉量控制在25mm之内,顶板离层量仅为2mm左右;顶板淋水问题得到解决,围岩裂隙得到有效充填加固,留巷巷道变形进入稳定阶段,能够满足后期使用要求。 Aiming at the large deformation leading to support difficulty in gob-side entry formed by roof cuting pressure relief,which is caused by faults,roadway surface displacement and roof separation monitoring are used to obtain the deformation law and surrounding rock structure after the roadway surrounding rock is broken. According to the engineering requirements,a new type layered grouting technology based on inorganic grouting material and grouting technology is proposed for grouting reinforcement of the retained roadway. The engineering practice results show that after the layered grouting reinforcement,the surrounding rock deformation is quickly controlled,the roof subsidence is within 25 mm,and the roof separation is about 2 mm;the roof watering problem is solved, and the surrounding rock fissure is effectively filled and consolidated, the roadway deformation becomes stable and which can meet the requirements for following service.
作者 李爱军 李西凡 LI Ai-jun;LI Xi-fan(Chensilou Coal Mine,Yongcheng Coal and Electricity Group Co.,Ltd.,Yongcheng 476600,China;School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo 454000,China)
出处 《煤炭工程》 北大核心 2019年第10期50-53,共4页 Coal Engineering
关键词 层次注浆 切顶卸压 沿空留巷 围岩变形 layered grouting pressure relief by roof cutting gob-side entry retaining surrounding rock deformation
  • 相关文献

参考文献12

二级参考文献181

共引文献457

同被引文献145

引证文献15

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部