期刊文献+

基于C-OWA算子的装配式建筑吊装安全生产管理研究 被引量:6

Study on Safety Production Management of Prefabricated Building Hoisting Based on C-OWA Operator
下载PDF
导出
摘要 装配式建筑相较传统建造方式吊装作业居多,然安全隐患也随之增加。文中在既有文献基础上,从影响装配式建筑吊装作业安全的3个阶段,构建出含12个指标的风险因素指标体系。借助C-OWA算子对指标赋权并结合ABC分类法,探究出装配式建筑吊装主要风险因素,针对主要风险因素,提出对策建议,以为装配式建筑吊装作业安全生产管理提供参考。 Compared with the traditional construction method,the hoisting operation of prefabricated buildings is more,but the safety risks are also increased.Based on the existing literature,this paper constructs a risk factor index system with 12 indexes from three stages that affect the safety of assembly building hoisting operation.With the help of C-OWA operator and ABC classification,this paper explores the main risk factors of assembly building hoisting,and puts forward countermeasures and suggestions for the main risk factors,so as to provide a reference for the safety management of assembly building hoisting operation.
作者 王定河 尤洋洋 WANG Ding-he;YOU Yang-yang(Beijing University of Civil Engineering and Architecture,Beijing 100044,China)
机构地区 北京建筑大学
出处 《价值工程》 2020年第1期55-57,共3页 Value Engineering
基金 北京建筑大学研究生创新项目资助“城市建设安全生产韧性管理研究”(PG2019084) 住房与城乡建设部软科学研究项目“大型复杂建筑工程安全韧性演化机制与集成管理研究”(2018-R3-007)
关键词 装配式建筑 吊装 安全生产管理 C-OWA算子 assembly building hoisting safety management C-OWA operator
  • 引文网络
  • 相关文献

参考文献5

二级参考文献35

共引文献147

同被引文献41

引证文献6

二级引证文献38

;
使用帮助 返回顶部