期刊文献+

风机叶片密封环预安装现场验证及优化 被引量:1

On-site Verification and Optimization of Wind Turbine Blade Sealing Ring Pre-installation
下载PDF
导出
摘要 长期以来,金风风力发电机叶片一直都在现场安装,受制于叶片密封环结构、人员素质和安装工艺等因素影响,导致叶片密封环安装质量存在一致性差、安装效率低等问题。因此,将叶片密封环前置到厂家安装很有必要。从叶片密封环在厂家安装后现场验证的角度出发,分析了密封环在厂家安装时存在的问题,提出了相应的解决方案。 Jinfeng wind turbine blades have been installed on site for a long time,due to the influence of blade sealing ring structure,personnel quality and installation process,the installation quality of blade seal ring is poor in consistency and low in installation efficiency.Therefore,it is necessary to install the blade sealing ring in factory. In this paper,from the perspective of on-site verification of blade sealing ring after installation by the manufacturer,the problems existing in the installation are analyzed,and the corresponding solutions are proposed.
作者 孙文杰 SUN Wenjie(Chongqing Institute of Engineering,Chongqing 400037,China)
出处 《山西电力》 2019年第6期58-60,共3页 Shanxi Electric Power
关键词 叶片密封环 预安装 现场验证 blade seal ring pre-installed on-site verification
  • 相关文献

参考文献4

二级参考文献14

共引文献14

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部