特高压工程绝缘油交接试验问题分析 被引量:1

Analysis on Problems of Insulation Oil Commission Test in UHV Project
下载PDF
导出
摘要 根据现行的绝缘油试验相关标准及施工验收规范,结合以往特高压工程建设经验及试验单位调研意见,对特高压工程绝缘油试验项目内容及划分、试验标准、试验费用等进行了梳理分析,并给出了预算定额及技术规程修订完善的意见与建议。以期减少在特高压工程建设管理过程中交接试验环节的专业协调工作,为后续特高压工程绝缘油交接试验工作规范开展与费用计列提供合理依据。 According to the current insulating oil test related standards and construction acceptance specifications,and combined with previous UHV project construction and the survey advises of relevant units,The content and division,test standards,test costs,etc.of insu-lating oil test items for UHV project were combed and analyzed,and suggestions and suggestions for budget quota and technical regulations revision were given.In order to reduce the professional coordination of the commission test in the UHV project construction management process,and provide a reasonable basis for the follow-up UHV project insulation oil commission test work specification and cost calculation.
作者 董然 马卫华 刘振 王艳 刘波 DONG Ran;MA Wei-hua;LIU Zhen;WANG Yan;LIU Bo(State Grid AC Engineering Construction Company,Beijing 100032,China)
出处 《电工电气》 2020年第6期62-64,共3页 Electrotechnics Electric
关键词 特高压工程 绝缘油 交接试验 UHV project insulating oil commission test
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部